Customized gold 2 layer PET cake tower with transparent lid

Cupcake Container/Box
February 13, 2025
Category Connection: Plastic Chocolate Packaging
New Product Preview
gold 2 layer PET cake tower with transparent lid。
Golden PET/PP material cake box. The design is quite innovative: it consists of two gold trays of different sizes combined to form a tower shape. The pattern in the middle of the bottom tray can be embedded into the bottom of the top tray to form support.
The transparent cake lid is embedded in the bottom tray to form a sealed cake tower. This design can also be used for decorating with chocolate.
Brief: Discover our Custom Gold Vacuum Formed Trays for Chocolates, designed to elevate your product displays with a luxurious gold finish. These food-grade blister packaging trays feature a patented pyramid design, ensuring premium aesthetics and brand recognition. Perfect for chocolates, truffles, and luxury items, they offer customization options and cost-efficient production.
Related Product Features:
  • Patented pyramid design for premium aesthetic and brand recognition.
  • Made from FDA/EC-compliant PET/PS plastics, ensuring food safety.
  • Luxury gold finish via vacuum metallization or foil-stamping techniques.
  • Customizable sizes, logos, and surface finishes to match your brand.
  • High-volume production capacity with 100,000+ units/day.
  • Modular assembly for flexible stacking and space-saving storage.
  • Shockproof protection with custom EVA-padded cavities.
  • SGS-certified materials and 100% manual inspection for quality assurance.
Faqs:
  • What materials are used in these trays?
    The trays are made from FDA/EC-compliant PET/PS plastics, ensuring non-toxic, odorless, and direct contact safety for chocolates and confectionery.
  • Can I customize the size and design of the trays?
    Yes, the trays offer adjustable sizes, embossed/foil-stamped logos, and various surface finishes (glossy/matte) to match your brand requirements.
  • What is the production capacity and lead time?
    The production capacity is 100,000+ units/day with an MOQ of 1,000 units and a lead time of 7-12 days.